Did you know it is a legal requirement to have a TM44 Air Conditioning Audit if your building has 12kW+?  This is been policed by the Trading Standards and fines are been enforced for those buildings who are not compliant.

To see if your building is compliant please visit Department for Communities and Local Government.  

Royale Refrigeration & Air Conditioning can provide AC inspections and reports, as well as follow up technical and energy audits to ensure that your business can meet its Carbon Reduction Commitment obligations and to make sure your business complies.

Royale Air Conditioning, Out of Hours F-Gas Compliant Maintenance to Mitsubishi Electric R2 VRF plant in Hook, Hampshire

Posted: Mar 08, 2017

Early start for the Royale Air Conditioning service and maintenance engineers, carrying out high level maintenance works in a timely manner for one of our key clients.

If you have a site with specific access requirements to plant, and need the works carrying out at a time to suit your business needs to keep your business compliant.

Royale providing fully trained IPAF engineers, with health and safety been our first priority, providing our customers with F-Gas compliant maintenance packages to fit in with your CapEx maintenance costs. 

Royale Air Conditioning Promoting the use of R32 – why?

Posted: Feb 28, 2017

Why R32?
In March 2014, the European Parliament passed the 2014 EU F-Gas Regulation legislation. A landmark ruling, the regulation has one key objective: to reduce F-Gas emissions by 79% between 2015 and 2030, by cutting the availability of hydrofluorocarbons (HFCs) with a high Global Warming Potential (GWP).

 

Royale Air Conditioning Maintenance Works Carried out in a Secure Data Centre in Berkshire

Posted: Feb 22, 2017

A team of Royale air conditioning engineers carrying out critical maintenance visit today, why is maintenance so important our customer asked our engineers:

To reduce CFC loss to atmosphere by checking for symptoms of gas leaks.

To ensure plant operating at peak performance.

To prolong the working life of the plant no matter what application you have.

To reduce possibility of major breakdown caused by minor malfunction.

To ensure plant is in a safe working condition, electrically and mechanically.

To ensure plant is treated for bacteriological growth.

Royale Air Conditioning Manchester 0161 452 4762

Posted: Feb 13, 2017

Royale Air Conditioning Manchester, having a great day meeting with old and new customers, discussing F-Gas compliant maintenance packages across the North West, explaining what the true cost of good maintenance means to our customers.

Also looking over some up and coming air conditioning projects in the city centre.  Great seeing how pro active and busy people and companies are at the moment.

UKATA Asbestos Awareness Training Certification

Posted: Feb 09, 2017

Royale engineer Jack Dickety passes his UKATA Asbestos Awareness On-line E training course in asbestos awareness.

Royale going the extra mile, ensuring all in house labour and supply chain engineers are health & safety aware with up to date training in the HVAC industry.  

To reduce the risk of exposure to our customers and engineers keeping everyone working in a safe environment is Royale's priority. 

Reactive Repair to Daikin VRV in Dorset

Posted: Jan 27, 2017

Royale Air Conditioning providing emergencey reactive repair to a large car dealerships heating system in Dorset

Site is served by Daikin VRV plant providing main primary source of heating, system reported to not be operating correctly. A Royale engineer attended site to find a component on the system had a refrigerant leak, full repair, re-pressure test and commission all carried out swiftly by the Royale service engineer.

First Crane Lift for 2017 @ Royale Refrigeration

Posted: Jan 23, 2017

Well done to all involved @ Royale for the crane lift works in Crawley on Saturday 07th January.

Royale have just had new blast freezer -40oC refrigeration plant put into position, project fully designed and installed by the specialists at Royale Refrigeration.