Skip to main content

Daikin VRV and Heat Pump Air Conditioning Installation Chichester West Sussex

Project: Mercedes Benz of Chichester 

C/o Ridgeway Group

Mercedes Benz of Chichester

A259 Near Colworth

Chichester

West Sussex

PO20 2BJ

Works Carried Out: Year 2016

Contract Value: 50K

Requirement:

Royale’s scope of works was to replace old air conditioning plant, for new plant to also suite the new refurbished office layout.

Challenged by:

Works had to be undertaken whilst the site was live so minimum disruption to the operation of site was key when planning and carrying out the change of plant.

What we did:

Royale selected Daikin VRV IV for the cellular offices to provide them with much needed heat recovery system, providing site with far better energy efficient and practical system to that of the old plant that was installed, and for the show room area ducted sky air heat pumps that are specifically capable to operate “re-using existing pipe work services” This reducing the programme time on site for delivering the project and also avoiding major disruptions to site.

What Client Said:

Very impressed with how smooth Royale executed the works on our flag ship Mercedes dealership, happy to have Royale on our sites in the future.