When was the work carried out?

Fitting best as always to the schedules of our clients, the Royale team’s works were carried out during the club’s annual shutdown period in August. This rare opportunity meant zero disruption to club activities – a real benefit for the client and the Royale team who are used to working around the core hours of active offices and busy retail stores.

What type of system was installed?

With much of Brooks’s clubhouse under renovation, Royale engineers installed two brand-new Daikin VRV air-conditioning systems. Integrated across several rooms, these industry-leading systems are energy efficient and replete with smart management controls.

What requirements did the client have?

Built in a classical Palladian style, the unique aesthetic of Brooks’s clubhouse was marred a little by an older, unsightly air-conditioning system long overdue a replacement. The new VRV system, combined with a change from fan coils to concealed ducted systems, gave the area full AC functionality without any visual obtrusion.

What did Royale do?

As is often the case, Royale’s work was split into two phases: The removal of the older Hitachi AC system and its replacement with the newer Daikin VRV solution.

Were there any challenges?

Despite falling within a regular maintenance period, time was still tight. The Royale team had to ensure all areas were fully operational for full re-opening to particularly discerning club members. This together with the need to conceal the new system without impacting functionality was a real challenge we’re proud to say our team met to the letter.

What were the results?

The difference between an older and newer AC system is significant. Installed properly, the new Daikin system is easier to maintain, more energy and cost-efficient - and almost entirely concealed to club visitors and members. It’s easier to adjust, activate and deactivate, too.

Was did the client say?

We’re proud to say that Royale’s client contact at Brooks, Ian, was complimentary of our work. Harry, one of the members of the Royale team involved, was praised in particular – well done Harry!

When was the work carried out?

Our work for Cobbs Farm began in November 2018 and finished in March 2019. Tight deadlines and the need for a new fully customised system made every month interesting and engaging for our engineers.

What type of system was installed?

Cobbs came to us for a complete fit-out of their brand-new farm shop. The requirement included air conditioning systems, a general-purpose refrigeration and freezer room and a dry ageing room. Remote display refrigeration cabinets were also installed in customer facing areas of the farm shop.

What requirements did the client have?

Display chillers, air conditioning and cold storage formed a large part of Cobb’s requirements. As a retail store, it was vitally important the newly installed equipment was reliable, visually sleek and did not intrude into customer facing areas of the shop.

What did Royale do?

First off, an energy efficient air conditioning system was installed using custom pipework to connect to an external condensing that provides much better energy efficiency throughout the summer months. Display chillers were carefully installed into the shop area to allow Cobb’s to display products in a visually pleasing way. A tailor-made dry-aged beef room was built with a window that allows customers to see the products inside. A general-purpose refrigeration and freezer room was also built.

Pipework and cabling for all the equipment was hidden away where possible so as not to interfere with the sleek visual appearance of the farm shop’s customer facing areas.

Were there any challenges?

Pipework is often challenging, especially when so many different types of equipment are required within one retail space. This, together with tight deadlines, made this job slightly more challenging but our engineers completed it on time and to spec without any problems.

What were the results?

Simply put, a reliable and energy efficient system was installed that provides consistent temperature control and a positive the retail experience for customers. Great stuff.

When was the work carried out?

The Royale team finished this challenging project in May 2019. Involving renovation of a space over 3,000 square metres in size, it was an extensive project we’re proud to have worked on.

What type of system was installed?

A large building like Longacres requires a top-end system. In this case, Royale supplied and installed a BlueBox smart heating and cooling solution; a system from an excellent brand known for efficient and consistent temperature control.

What requirements did Longacres have?

Longacres has challenging storage requirements due to the sheer size of its stockholding and the requirement for such precise temperate control. The company’s diverse array of plants and organic produce has varying requirements for temperature and moisture for it to stay healthy and ready for sale. Our solution had to cater to every requirement in different areas of the Longacres building; quite the task.

What did Royale do?

The existing underfloor heating was integrated into the new BlueBox heater to keep the building warm in winter months, thus ensuring consistent temperate for the plants and produce inside the building. This, in addition to chilling fan coils designed to stop flowers from wilting and maintain temperatures across the shop floor area, was the main body of the project’s work.

Were there any challenges?

As is the case with any large retail area, Longacres had a demanding footprint to work around. Varying requirements of twenty-four-hour temperature control was a tough one! Flushing the pipework to clean the bacteria that accumulated from the previous system was also a technical task that had to be done before installing the new system.

What were the results?

A well-executed project in a retail space is hard but always rewarding. Longacres now has excellent temperature control throughout its 3,000+ square metre area – and thanks to the planning efforts of Royale’s engineers, the new system is visually unobtrusive, affordable and easier to maintain.

Royale Refrigeration and Air Conditioning providing retail clients with new air conditioning and ventilation installation services to Starbucks Coffee sites from Scotland to London.  Royale are fully accredited Toshiba Air Conditioning contractor.  

Providing our clients with peace of mind in house design capabilities, full project management high installation standards with the majority of sites services exposed, complete with Toshiba seven year warranty on parts and labour providing peace of mind on all works.  

Royale have been working directly with Starbucks Coffee for over 15 years now and we fully appreciate the criticality of each and every sites plant, which is why our service division and fleet of in house engineers carry a van stock of service items covering the majority of Refrigeration, Ice Machine and Air Conditioning Plant aiming to provide first time fix, a green proactive engineering approach results in a happy customer and years of repeat business.  

Royale Air Conditioning carrying out the first F-Gas compliant maintenance health checks to a Mitsubishi Electric Mr Slim R410a project we installed approximately 6 months ago in the Midlands.

If you require a specialist passionate contractor who can provide you with full design, installation, and aftercare services, offering F Gas compliant maintenance packages, along with TM44 Audits, then contact the team at Royale to see how we can assist you further.

www.royaleref.com 

 

Royale have recently had the pleasure of shooting a Daikin R32 promotional video on the use of designing and installing R32 refrigerant applications.

We have recently installed High COP roundflow cassettes and high level wall mounted fan coils to a high end retail store “K-Way” on Henrietta Street Covent Garden.

Royale are continuously looking to be green environmental engineering solution specialists.

So for us to promote R32 with one of the largest manufactures Daikin was a great pleasure to all involved.

Special thank you to:

  • Anette Scheepers – Daikin Sales Engineer for Royale
  • George Derbyshire – London Area Sales Manager
  • Claire Perry – Marketing Specialist
  • Royale Engineers – Gary & Dave
  • Royale Technical Director – James Sheppard  
  • Royale MD – Simon Sheppard

If you have a project or want to make a difference to the environment you work in, then consider the use of R32 application and contact Royale for your perfect business solution specialist.

www.royaleref.com

 

Commercial Office Fit Out

Chester Business Park

Chester

Cheshire

 

Works Carried Out: Year 2015 > 2016

Contract Value: 400K

Requirement:

Royale’s scope of works, to provide full design, installation and commissioning of new Daikin heat recovery air conditioning services to an existing office development in Chester’s Business Park.  Providing the installation of Daikin VRV 3-pipe heat recovery air conditioning throughout the building, complete with a BAC-net BMS system to provide client with full front end control of all HVAC plant. 

Challenged by:

Royale had to work to a tight programme to deliver the project on time and on budget for the main contractor, providing full detailed mechanical services drawings at each phase of the works, right through to completion working alongside various other trades.

What we did:

Royale provided a SSSTS working team of engineers to continuously communicate to the project managers, each stage, and element of works across site, enabling the project to be completed snag free.

What Client Said:

Very impressed with how Royale executed all works brilliantly, our first project with Royale and certainly not our last, especially considering the project is an existing office development which was live, various access and egress restraints.  Royale provided full project management to deliver the installation of there services.  

 

Project: Mercedes Benz of Chichester 

C/o Ridgeway Group

Mercedes Benz of Chichester

A259 Near Colworth

Chichester

West Sussex

PO20 2BJ

Works Carried Out: Year 2016

Contract Value: 50K

Requirement:

Royale’s scope of works was to replace old air conditioning plant, for new plant to also suite the new refurbished office layout.

Challenged by:

Works had to be undertaken whilst the site was live so minimum disruption to the operation of site was key when planning and carrying out the change of plant.

What we did:

Royale selected Daikin VRV IV for the cellular offices to provide them with much needed heat recovery system, providing site with far better energy efficient and practical system to that of the old plant that was installed, and for the show room area ducted sky air heat pumps that are specifically capable to operate “re-using existing pipe work services” This reducing the programme time on site for delivering the project and also avoiding major disruptions to site.

What Client Said:

Very impressed with how smooth Royale executed the works on our flag ship Mercedes dealership, happy to have Royale on our sites in the future.

 

 

Project: Commercial Office Fit Out

Reading

Berkshire

Works Carried Out: Year 2015

Contract Value: 350K

Requirement:

Royale’s scope of works, to provide full mechanical design, installation and commissioning of HVAC services to a new build office development.  Providing the installation of Daikin VRV 3-pipe heat recovery air conditioning throughout the building, along with a new mechanical wet system and AHU ventilation plant complete with associated ductwork and grilles all services integrated with a BAC-net BMS system to provide client with full front end control of all HVAC plant. 

Challenged by:

This was a new build project, Royale had to work to a tight programme to deliver the project on time and on budget for the main contractor, providing full co-ordinate mechanical drawings at each stage of the works right through to completion working alongside various other trades.

What we did:

Royale provided a SSSTS working team of engineers to continuously communicate to the project managers, each stage, and element of works across site, enabling the project to be completed snag free.

What Client Said:

Very impressed with how Royale executed the works considering the new build was built on an existing office development which was live, various access and egress restraints.  Royale provided first class project management to deliver the installation of there services.  

 

Project: Curtis & Carder Ltd, High End Domestic New Build Project, Berkshire.

 

Curtis & Carder Ltd

High End Domestic New Build Project

Newbury

Berkshire

RG20 0BJ

Works Carried Out in: Year 2016

Contract Value: 74K

Requirement:

Royale’s scope of works was to install and commission new Daikin VRV IV heat pump systems, throughout a large high end domestic property in Berkshire, consisting of 19No ducted fan coils across 4No VRV systems, complete with wireless remote controllers, and a central I touch screen controller.  To provide comfort cooling/heating. 

Challenged by:

Works had to be carried out in a high end residential property in a rural location in Berkshire, very limited space was available for our containment to be installed.

What we did:

Royale provided senior experienced engineers on the project who are used to working on this type of project, we provided high level project management to co-ordinate the installation of our services between the consultant, main contractor and client.

What Client Said:

Very happy with the end result, full comfort cooling and heating now available with local controls and a central controller to manage all AC plant on site.